L MR LORD ← ecosystem
LORD ENERGY

The tonnage lies.
The age of the kilo does not.

Infectious healthcare waste must be treated within a legal deadline — 48 hours, and 24 in the Philippine hot season. Every operator counts kilos. Nobody counts the hours. We built the software that does — and it halves the collection rounds.

810
kg/day · one 300-bed hospital
48 h
legal limit
€0.151
per kg · price actually paid
133–296
tCO₂e avoided / site / year
The finding

A dashboard can show success while half the waste is illegal.

99.6 %
treatment rate displayed by the site
53.5 %
of the treated waste had passed the legal 48-hour limit

Measured over 365 simulated days on a fixed 36-hour collection cadence. Weight tells you nothing about compliance. The age of each kilo, from production to treatment, tells you everything — and no operator tracks it today.

What we sell

A control law, and the paperwork it produces.

A truck that arrives creates the very backlog it will have to clear. The collection threshold follows from that, and it is not a fixed clock:

threshold = (48 h − margin − queue/throughput) ÷ (1 + inflow/(24 × throughput))
729
collection rounds per year · fixed cadence
414
rounds per year · zero breach, same tonnage

The treatment contract obliges the operator to issue a pull-out slip at every collection, a certificate of treatment, and a monthly report before the 10th. Three of our agent's eight tools produce exactly those three documents. We do not sell intelligence on top — we produce the obligation.

The limit

It is not 48 hours everywhere — and the control law does not care.

Senegal's decree gives 48 hours. The Philippine health ministry manual gives 48 in the cool season and 24 in the hot season, unless a refrigerated store is available.

100 %
out of compliance for a fixed cadence, once the limit halves
0 %
for our control law — without a single line changed

It is parameterised by the limit, not wired to 48. That is the cleanest demonstration of its design we have produced, and we were not looking for it.

Cold room that lifts the 24-hour constraint4–11 m³
Capex, sized on the 541 kg backlog measured at the bench€2,000–9,400
Saved per year in collection rounds avoided€1,655–15,858
Payback0.1–5.7 year

A regulatory constraint became a second piece of hardware sold with the module. The 0.1 to 5.7 year spread comes from one documentary unknown: the manual uses "hot season" three times without ever defining it. One line of enquiry to the ministry closes it by a factor of three.

The site

Container A — the one that cleans.

In, per day

Food waste 315 kg

Plastics 176 kg

Healthcare waste 160 kg

Inside

Sealed digesters: bacteria break down the organics

Shredder and heated press: plastic sheets

Microwave at 110 °C: no longer infectious

Out, per day

Cooking gas 25–63 m³

Digestate, the fertiliser

Sheets and inert residue

Nothing is burned. There is no smoke. The gas feeds 10 to 25 households that cooked on charcoal, replacing 27 to 69 tonnes of charcoal a year at the national biogas programme's own conversion rate. Seven people work on site, at three euro cents per kilo treated.

Container B — the one that grows.

In

The digestate from container A

Water 20–40 m³ per cycle

3.7 kWh/day, solar

Area is a parameter

Soil, air and light sensors

Catalogue greenhouse: €10.94/m²

Out, at 120 m²

Tomatoes 720–1,080 kg/yr

Worth €2,023–3,035

Payback 0.4–0.7 year

We long wrote that the greenhouse does not pay for the site. That was the wrong statement: it compared the smallest possible unit with the largest possible site. Capex and revenue are both proportional to area, so it pays back in four to eight months at any size. What bounds its size is the digestate mass and the local market — neither is measured yet, and we say so. A trial in Niger showed a badly tuned greenhouse divides the harvest by five, which is precisely why it needs piloting.

The economics

At parity with what the hospital next door already pays.

Price awarded by a Philippine public hospital, 2026 contract€0.151 / kg
Our cost, 314 t/year site — all items measured€0.144–0.181 / kg
Same service in Greece, for scale€0.622–2.103 / kg
CO₂ avoided per site, national inventory method133–296 t/yr
Sites needed for Senegal's own waste-sector target788–2,128

Cost of ownership includes amortisation over seven years, seven staff at the charged minimum wage, consumables, electricity at the published regulated tariff, maintenance benchmarked on a public tender, and magnetron tubes at the manufacturer's rated life.

What is not true yet

We would rather say it than have you find it.

  • The physical module does not exist. The simulator, the agent and the benchmark run. The container has not been built.
  • A model piloting in real time performs worse than a hand-written rule — 761 kg/day against 800, with four times more calls. The model's job is to find the rule; the rule then runs for free, offline.
  • We do not have a maintenance quote for this class of machine. It is the one item that still moves the cost of ownership by a factor of two.
  • The demonstrator belongs in the Philippines, not Senegal. 4.5× the feedstock, twice the collection coverage, and incineration banned by law.
Contact

Hospitals, operators, and anyone who counts kilos.

Partners & pilot sites
partnerships@mrlordenergy.com
A signed letter of intent from a tertiary hospital is what we are looking for.
Founder
christophe@mrlordenergy.com
Technical dossier, 200 open sources and the benchmark code available on request.

Every figure on this page comes from an open source or from a program that was run: the Philippine Department of Health waste management manual, an awarded public contract, the Senegalese biomedical waste decree and national plan, the electricity regulator's tariff schedule, IPCC 2006 inventory methods, and 365 simulated days of a site under five scenarios.